At an all-Russian meeting on preparation for the winter period, Deputy Minister of Construction and Housing and Utilities of the Russian Federation Alexey Eresko announced the list of territories lagging behind the national average. Along with Dagestan, the list included the Ryazan and Lipetsk regions, the Krasnoyarsk Territory, and Kabardino-Balkaria. The official drew the attention of regional leaders to the need to accelerate the pace of work.
As of the end of summer this year, the readiness of the housing stock in Dagestan reached only 62 percent. Of the planned 12.1 million square meters, 9.8 million had been prepared. The situation with engineering infrastructure looks no less tense: of 481 boiler houses, 336 were ready to function, and of the single central heat point, the readiness rate was 100 percent, which likely shapes the overall statistics for this node.
For comparison, the average readiness of communal infrastructure across all of Russia is 99 percent. Heat is supplied to 2,379 municipal formations covering 72 regions. In the new subjects of the federation, according to the ministry's assessment, this indicator is 95 percent. Despite the fact that Dagestan is in the risk zone, tourists should bear in mind that the 2026–2027 heating season is still ahead, and the situation may change by the time of their visit.
Travelers planning trips to the republic during the cold season are advised to clarify the status of utility services in a specific area in advance. Although infrastructure is in the process of preparation, the availability of backup heat sources in hotels and nursing homes is a critically important factor for comfort. It is better to choose accommodation facilities with independent heating systems to avoid possible interruptions.
The overall picture across the country demonstrates a high degree of readiness for winter, however, local problems in individual subjects require constant control. The inclusion of Dagestan in the list of laggards indicates the need for additional resources and time to complete network repairs. Before the onset of cold weather, authorities have the opportunity to rectify the situation to ensure stable heat supply for both local residents and guests of the region.