The field inspection took place in the village of Novokuli on October 18. Sultan Khamsatov, first deputy head of the municipality, and Omar Djalalov, general director of JSC "Novolakskoye DEP No. 28," participated in the inspection. The transport artery connects the settlements of Charavali and Novokuli.
The structure sustained serious damage during the floods that occurred in late March and early April 2026. During the inspection, participants in the field meeting assessed the quality of the contractor's work. According to Omar Djalalov, reinforcement and construction measures were carried out. The main goal of these actions was to restore the bridge's load-bearing capacity and increase its resistance to future hydrological threats.
Special attention was paid by administration representatives to flood prevention. On another part of the village of Novokuli, work on the installation of special water passages has been completed. This measure aims to effectively divert storm flows during heavy rains. The implementation of the project will help reduce the risk of damage to the road surface and adjacent infrastructure areas.