Emergency restoration work on the Red Bridge in the Gerbil district continues under new circumstances. Completion was initially scheduled for October 31, but the timeline has been extended to November 28. This decision followed an unexpected water release from the Gotsatlinskaya HPP on October 2, which washed out the work site and shifted temporary supports, causing the metal spans to collapse and necessitating additional structural inspections.
Acting Minister of Transport of Dagestan Dzhambulat Gadzhiev emphasized the need for strict accountability for uncoordinated water releases from the Gunib and Gotsatlinskaya HPPs. Such actions pose a direct threat to the lives of construction workers and damage completed work. Despite previous agreements with RusHydro to coordinate release volumes, incidents continue to occur. Prime Minister of the Republic Magomed Ramazanov monitors the work daily, following instructions from Acting Head of the Region Fyodor Shchukin.
The contractor, Sibregionstroy, is working on a non-profit basis. The organization does not receive commercial profit; its activities are based on compensation for incurred expenses. Specialists are simultaneously inspecting the span structures and repairing cross-bracing to ensure the stability of temporary structures. Previously, the contractor prepared an access road, lifted the spans onto temporary supports, and began dismantling the damaged central pier.
An alternative traffic arrangement through culverts was rejected by specialists from the State Budgetary Institution "Dagestanavtodor." Ramazan Kurbanov explained that such a structure would not withstand a sudden rise in water levels, posing a risk to the lives of drivers and passengers. Human safety remains the priority when selecting technical solutions in difficult mountain conditions.
Residents of mountainous areas, carriers, and entrepreneurs should note that transport links with the Khunzakh, Shamil, Tlyarata districts, and the Bezhta settlement are maintained via alternative routes. A public oversight headquarters for the restoration progress will be established in Dagestan. The Ministry of Emergency Situations of the republic will provide necessary assistance to the Ministry of Transport in addressing current tasks.