Magomed Ramazanov, acting head of the Dagestan government, confirmed that 24 kilometers of regional roads have been restored under the national project "Infrastructure for Life." Special attention was given to the Buynaksk-Kizilyurt route, considered the main access road to the Sulak Canyon.
This year, specialists updated 19 kilometers of pavement on the section from the 22nd to the 41st kilometer. Previously, in 2025, another 10-kilometer section was repaired. Thanks to these works, the entire road now meets regulatory standards. The upgrades included asphalt replacement, restoration of ditches and shoulders, and the installation of barrier fences and road signs. This infrastructure makes the path to the canyon safer and more convenient for tourists.
The second repaired object was the Manas-Sergokala-Pervomayskoye route. In the Sergokala district, two layers of asphalt were laid on a five-kilometer section (from the 53rd to the 58th kilometer). Road markings were also painted, signal posts installed, and the drainage system restored. This road is important for logistics, as it connects the Sergokala, Kayakent, and Levashin districts with Makhachkala and Izberbash, providing access to the federal highway R-217 "Caucasus."
Improving the road network directly affects the quality of trips. Tourists should note that the updated sections are now equipped with full signaling infrastructure, which increases comfort when driving in mountainous conditions.