Engineers from the Rostelecom North Caucasus branch have completed repairs on a 10 kV overhead line in the mountainous Dzheirakhsky District. The main work involved replacing 1.2 kilometers of worn-out wire with a domestically produced self-supporting insulated cable. Additionally, a new disconnect switch was installed on the line. This infrastructure is critically important for the stable supply of electricity to the village of Furtoug and the stone-crushing enterprise operating there. The use of modern wire minimizes the risk of short circuits in bad weather, protects networks from the accumulation of wet snow, and reduces the likelihood of electric shock injuries. The work was carried out as part of the technical maintenance program for 2026. For tourists planning to visit the high-altitude areas of Ingushetia, such upgrades mean fewer power outages in remote locations. In mountainous terrain, temperature fluctuations and precipitation often cause failures in old networks, so replacing wires with SIP significantly improves living conditions and services in Furtoug. It is recommended to check the current status of transportation services and road conditions when traveling to mountainous areas, as infrastructure changes may be accompanied by temporary access restrictions.
Power Lines Upgraded in the Mountain Village of Furtoug, Ingushetia
Specialists from Ingushenergo replaced outdated wires with modern Self-Supporting Insulated Wire (SIP) in the Dzheirakhsky District, improving the reliability of electricity supply to the mountain settlement of Furtoug.
Read also
Illustration from our photo library