Skip to content
Getting there Updated

Grade-Separated Intersection to Be Built in Tyube to Eliminate Chronic Traffic Jams on the Caucasus Highway

The authorities of Dagestan have approved a plan to construct a two-level interchange in the settlement of Tyube to address traffic congestion on the federal highway R-217. Work to eliminate the railway crossing is scheduled to begin in early 2027.

Photo from the Caucasus Compass photo library Illustration from our photo library

The Ministry of Transport and Road Infrastructure of the Republic of Dagestan has officially responded to numerous complaints from motorists and passengers regarding long queues at the railway crossing in the settlement of Tyube. Traffic jams on this section have become a chronic problem for those crossing the region via the federal highway R-217 "Caucasus." The bottleneck is located at the 793-kilometer mark of the road, where vehicle traffic regularly intersects with train movements.

The regional government has decided to launch the "Northern Bypass of Makhachkala" project starting from its third stage. The main capital investments will be directed specifically to this location. According to the approved plan, a two-level interchange will be built here, with a road passing under the railway tracks. This engineering solution will completely eliminate the intersection of traffic flows at the same level.

Implementation of the project will permanently solve the long-standing problem of traffic jams that has accumulated over years of road operation. The contractor has already been selected: the state contract was signed on August 28, 2026. Currently, specialists are finalizing the working documentation required to start construction and installation works. The reconstruction process itself is scheduled for the first quarter of 2027.

Until construction begins, drivers should take into account the specific terrain and traffic intensity in the area of the settlement. Passing through this section of the highway requires heightened attention and extra time, especially during peak hours. The future interchange will change the region's logistics, but until early 2027, the route through Tyube will remain the only main corridor.

Tourists and truckers planning a route through Dagestan are advised to allow extra time to traverse this section. No alternative detours are currently provided in this area, so all traffic load falls on the existing highway. Successful completion of the third stage of the project will be an important step in the development of the transport infrastructure of the entire republic.

Read also