The opening ceremony took place in the presence of First Deputy Minister of Transport Konstantin Pashkov and Head of the Federal Road Agency Roman Novikov. Representatives of the republic's relevant ministry, the Prokhladny District Administration, Upravdor, and the contracting organization also participated. This section is part of Russia's Core Road Network and serves as a key link in the North–South transport corridor, connecting Kabardino-Balkaria, the Stavropol Krai, and North Ossetia–Alania. Daily traffic volume reaches 10,000 vehicles, including heavy-tonnage transit.
Major repairs were carried out under the national project "Infrastructure for Life." Within the republic, 6.5 kilometers of road within the Prokhladny city limits and an additional 7.6 kilometers were brought up to standard. Construction work began in 2025. At peak times, up to 40 workers and 50 units of machinery were deployed on site. Thanks to efficient logistics, the project was completed a month ahead of schedule. Specialists who ensured high-quality work received state and departmental awards.
By the end of the current year, repairs to the 224-meter overpass are scheduled for completion. The structure's components will be fully replaced, and new access roads totaling 2 kilometers will be constructed. The opening coincided with the centennial celebration of the road industry in Kabardino-Balkaria. To test the quality of the new pavement, a column of heavy special machinery drove along the route. Local residents and drivers are advised to consider the current condition of the access roads to the overpass, as work there is still ongoing.